03.
THE CHALLENGE
The property's position within the hillside made the structural and construction requirements considerably different from those of a conventional new-build house.
Large sections of the reinforced concrete structure were required to retain the surrounding ground while simultaneously forming the basement and structural frame of the property.
The varying ground levels also required careful sequencing of the excavation, retaining structures and concrete works.
Access, temporary conditions, material movements and concrete pours all needed to be carefully coordinated throughout construction.
04.
OUR APPROACH
South East Formwork delivered the basement and reinforced concrete works through a planned sequence beginning with the excavation and preparation of the hillside.
Following formation of the basement level, the foundations and basement slab were constructed before progressing with the reinforced concrete retaining walls and structural elements.
The concrete frame was then developed using a combination of RC walls, columns and suspended slabs, creating the main structural form of the property.
By carrying out the groundworks, formwork, reinforcement and concrete operations as a coordinated package, our team maintained control of the critical interfaces between the below-ground and structural elements.